29 March '06: The renewed track through platforms 1/19 has now had a new scissor crossover installed, which will connect to the track serving the new platform. This was installed over the weekend of 25/26 March, having been delivered by 66135 and 66140 on BPA 'Boplate' wagons. The crossover is in a different position to the former pointwork, requiring the protecting signals to be moved.
29 March '06: The renewed track through platforms 1/19 has now had a new scissor crossover installed, which will connect to the track serving the new platform. This was installed over the weekend of 25/26 March, having been delivered by 66135 and 66140 on BPA 'Boplate' wagons. The crossover is in a different position to the former pointwork, requiring the protecting signals to be moved.
29th March 2006
Waverley enhancement project
Merlin '60027' Photographs @ fotopic.net
21 March '06: Work area fenced off to create a green zone opposite platform 1, on what was previously the North Loop Siding. New overhead electrification stanchions are in the process of being erected, while equipment and materials is stored in front of the filled-in platforms 2/3.Previous | Next29 March '06: The new platform's brick retaining wall is quickly going up on the concrete base, seen in one of the 05 March pics. New rail is lying ready for use behind the protecting blue fence.

Comments left about this photograph:
None

Added on 29th March 2006, has been viewed 530 times